IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0317 # 10 Y:2011 10 2011 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0317 # 11 Y:2011 11 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,938 $3,000 Implemented
LE0317 # 13 Y:2011 13 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,553 $2,440 Implemented
LE0317 # 15 Y:2011 15 2011 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
AM0597 # 01 Y:2011 01 2011 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $21,840 $0 Implemented
AM0597 # 02 Y:2011 02 2011 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,900 $0 Implemented
AM0597 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,470 $750 Implemented
AM0597 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,970 $0 Implemented
SF0395 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $6,724 $0 Implemented
SF0395 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,312 $0 Implemented
SF0395 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,313 $7,243 Implemented
SF0395 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,833 $5,753 Implemented
SF0395 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $1,038 $1,467 Implemented
SF0395 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,112 $6,182 Implemented
SF0395 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $8,140 $22,037 Implemented
SF0395 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,772 $18,000 Implemented
UA0058 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,323 $2,200 Implemented
UA0058 # 04 Y:2011 04 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,325 $340 Implemented
UA0058 # 05 Y:2011 05 2011 REDUCE VENTILATION AIR $6,532 $4,798 Implemented
UA0058 # 06 Y:2011 06 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $45,899 $74,275 Implemented
UA0058 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,336 $19,786 Implemented
AM0595 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,770 $350 Implemented
AM0595 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,150 $160 Implemented
AM0595 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,190 $2,240 Implemented
AM0595 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,850 $1,160 Implemented