IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0390 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $789 Implemented
SF0390 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,024 $5,560 Implemented
SF0390 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,039 $2,749 Implemented
SF0390 # 12 Y:2010 12 2010 USE COMPRESSOR AIR FILTERS $2,168 $3,000 Implemented
SF0390 # 13 Y:2010 13 2010 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $39,251 $58,106 Implemented
SF0390 # 15 Y:2010 15 2010 USE PHOTOCELL CONTROLS $1,030 $2,587 Implemented
SF0390 # 18 Y:2010 18 2010 OPTIMIZE PLANT POWER FACTOR $5,696 $21,908 Implemented
DL0060 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,957 $26,400 Implemented
DL0060 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,362 $21,600 Implemented
UM0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $10,900 Implemented
UM0374 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $93 Implemented
NC0412 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140,256 $442,314 Implemented
NC0412 # 02 Y:2010 02 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $25,289 $50 Implemented
NC0412 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $100 Implemented
NC0412 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $2,841 $4,995 Implemented
NC0412 # 05 Y:2010 05 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $7,153 $15,100 Implemented
NC0412 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,402 $1,200 Implemented
LE0301 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0301 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Implemented
LE0301 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $2,440 Implemented
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented
LE0301 # 15 Y:2010 15 2010 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0301 # 16 Y:2010 16 2010 INSTALL TIMERS AND/OR THERMOSTATS $153 $1,000 Implemented