IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0742 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,664 $275 Implemented
OK0742 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $2,516 $3,910 Implemented
UD0756 # 01 Y:2007 01 2007 USE POWER DURING OFF-PEAK PERIODS $58,368 $0 Implemented
UD0756 # 02 Y:2007 02 2007 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $54,790 $0 Implemented
UD0756 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,822 $18,000 Implemented
UD0756 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,237 $86,570 Implemented
UD0756 # 06 Y:2007 06 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $30,653 $5,000 Implemented
UD0756 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,180 $12,000 Implemented
UD0756 # 12 Y:2007 12 2007 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,769 $0 Implemented
UD0756 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $4,680 Implemented
UD0756 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $150 Implemented
SU0249 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,594 $0 Implemented
SU0249 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
SU0249 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $289 Implemented
SU0249 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $589 Implemented
SU0249 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $334 Implemented
SU0249 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,719 $16,400 Implemented
SU0249 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,403 $19,107 Implemented
WV0354 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $14,128 $900 Implemented
WV0354 # 05 Y:2007 05 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,489 $1,000 Implemented
WV0354 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,629 $0 Implemented
WV0354 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,596 $32 Implemented
WV0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $0 Implemented
WV0354 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,190 $408 Implemented
WV0354 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $857 $504 Implemented