IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

318

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1071 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,111 $952 Implemented
UD1071 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,375 $11,280 Implemented
UD1071 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,651 $1,800 Implemented
UD1055 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $716 $0 Implemented
UD1054 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $11,624 $1,500 Implemented
UD1054 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $500 Implemented
UD1054 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,142 $9,668 Implemented
UD1054 # 07 Y:2023 07 2023 DISCONNECT BALLASTS $172 $240 Implemented
UD1054 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $44,209 Implemented
UD1054 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $933 $7,594 Implemented
WV0596 # 01 Y:2020 01 2020 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $103,798 $40,718 Implemented
WV0596 # 11 Y:2020 11 2020 DEVELOP A REPAIR/REPLACE POLICY $1,750 $372 Implemented
WV0596 # 09 Y:2020 09 2020 INSULATE BARE EQUIPMENT $2,311 $1,566 Implemented
WV0596 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,729 $1,600 Implemented
WV0596 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $6,754 $7,949 Implemented
WV0596 # 16 Y:2020 16 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $326 $1,500 Implemented
WV0596 # 12 Y:2020 12 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,108 $1,828 Implemented
WV0596 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,079 $10,000 Implemented
WV0596 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $7,560 $7,967 Implemented
WV0596 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,186 $20,034 Implemented
WV0596 # 13 Y:2020 13 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $60 Implemented
WV0596 # 14 Y:2020 14 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $626 $4,034 Implemented
WV0596 # 15 Y:2020 15 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $507 $700 Implemented
UD1017 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,892 $0 Implemented
UD1017 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $2,299 $0 Implemented