IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0688 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,270 $26,600 Implemented
AM0688 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,290 $12,000 Implemented
AM0688 # 05 Y:2015 05 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,220 $1,880 Implemented
AM0688 # 06 Y:2015 06 2015 KEEP LAMPS AND REFLECTORS CLEAN $8,140 $4,320 Not Implemented
AM0688 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,060 $120 Not Implemented
AM0688 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $4,230 $5,100 Implemented
AM0688 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $40 Implemented
AM0688 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,690 $0 Implemented
AM0688 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,560 $240 Implemented
AM0688 # 12 Y:2015 12 2015 USE PHOTOCELL CONTROLS $730 $165 Implemented
LE0401 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,031 $45 Not Implemented
LE0401 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $183 Not Implemented
LE0401 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,142 $3,000 Implemented
LE0401 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $582 $343 Implemented
LE0401 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,751 $5,000 Not Implemented
LE0401 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $247 $245 Implemented
LE0401 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,205 $1,600 Not Implemented
LE0401 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $1,000 Implemented
LE0401 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $179 $280 Implemented
LE0401 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $732 $1,645 Implemented
LE0401 # 11 Y:2015 11 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,980 $15,100 Implemented
LE0401 # 12 Y:2015 12 2015 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $1,822 $6,360 Implemented
LE0401 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,934 $24,500 Not Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented