IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0131 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,218 $5,587 Implemented
MZ0131 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,807 $1,380 Implemented
MZ0131 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,179 $1,148 Implemented
MZ0131 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,084 $600 Implemented
MZ0131 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $1,019 Implemented
MZ0131 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $213 $310 Implemented
NC0501 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $68,635 $375 Not Implemented
NC0501 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $35,397 $25,000 Implemented
NC0501 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $100 Implemented
NC0501 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,685 $33,000 Implemented
NC0501 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $7,375 $4,511 Not Implemented
NC0501 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $1,630 Implemented
NC0501 # 07 Y:2013 07 2013 METER WASTE WATER $3,326 $4,200 Implemented
NC0501 # 08 Y:2013 08 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,569 $4,000 Not Implemented
NC0501 # 09 Y:2013 09 2013 INSULATE BARE EQUIPMENT $867 $660 Not Implemented
MI0250 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $25,326 $3,900 Implemented
MI0250 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,636 $1,660 Implemented
MI0250 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,559 $2,200 Implemented
MI0250 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,256 $80 Implemented
MI0250 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,052 $2,520 Implemented
MI0250 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,828 $80 Implemented
MI0250 # 07 Y:2013 07 2013 INSTALL SKYLIGHTS $2,274 $5,665 Implemented
MI0250 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,852 $5,600 Not Implemented
MI0250 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,490 $2,460 Not Implemented
MI0250 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,327 $4,510 Not Implemented