IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0257 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,731 $150 Implemented
UA0257 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,573 $5,533 Not Implemented
UA0242 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $36,295 $6,449 Not Implemented
UA0242 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,142 $9,682 Implemented
UA0242 # 05 Y:2021 05 2021 USE RADIANT HEATER FOR SPOT HEATING $15,077 $22,703 Not Implemented
UA0242 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,957 $4,986 Implemented
UA0242 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,385 $59 Implemented
UA0184 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $12,098 $21,400 Not Implemented
UA0184 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,765 $1,285 Not Implemented
UA0184 # 02 Y:2017 02 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $105,154 $36,000 Not Implemented
UA0184 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $1,155 $2,485 Not Implemented
UA0184 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $4,924 $6,004 Not Implemented
UA0184 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,297 $94,071 Not Implemented
UA0184 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,492 $250 Not Implemented
UA0118 # 04 Y:2014 04 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,812 $0 Not Implemented
UA0118 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,871 $70,925 Implemented
UA0118 # 07 Y:2014 07 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,430 $528 Not Implemented
UA0118 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,870 $100 Not Implemented
UA0118 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $10,122 $8,800 Implemented
UA0118 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $64,943 $3,600 Not Implemented
UA0118 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $57,584 $9,695 Implemented
UA0108 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $145 $607 Not Implemented
UA0108 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,894 $490 Implemented
UA0108 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,603 $2,591 Implemented
UA0108 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,872 $1,425 Not Implemented