IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0385 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $280 Implemented
IA0385 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $625 $904 Not Implemented
IA0385 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $694 $1,232 Not Implemented
IA0385 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,140 $9,328 Not Implemented
IA0385 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,794 $1,566 Not Implemented
IA0385 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,541 $27,500 Not Implemented
IA0385 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $428 $1,600 Not Implemented
OK0724 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $588 $322 Not Implemented
OK0724 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,492 $1,975 Not Implemented
OK0724 # 03 Y:2006 03 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,858 $4,100 Not Implemented
OK0724 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $380 $288 Not Implemented
OK0724 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $13,458 $0 Not Implemented
OK0724 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,235 $5,958 Not Implemented
OK0724 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,655 $2,592 Not Implemented
OK0724 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $169 $495 Not Implemented
OK0724 # 09 Y:2006 09 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $28,864 $61,416 Not Implemented
OK0724 # 10 Y:2006 10 2006 USE COMPRESSOR AIR FILTERS $2,647 $642 Not Implemented
OK0724 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,211 $5,963 Not Implemented
AS0417 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $20,720 $27,407 Not Implemented
AS0417 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,507 $12,000 Not Implemented
AS0417 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $9,586 $200 Not Implemented
AS0417 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,690 $1,000 Not Implemented
AS0417 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,247 $10,000 Not Implemented
AS0417 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $4,692 $10,000 Not Implemented
AS0417 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $7,797 Not Implemented