IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0348 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $2,935 $3,500 Not Implemented
NC0299 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $418,000 $275,000 Implemented
NC0299 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,998 $1,000 Implemented
NC0299 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $1,352 $1,030 Implemented
NC0299 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,143 $1,622 Implemented
NC0299 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,382 $9,255 Not Implemented
NC0299 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $373 $100 Implemented
NC0299 # 07 Y:2004 07 2004 SHUT OFF PILOTS IN STANDBY EQUIPMENT $895 $2,195 Implemented
IC0085 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $25,215 $2,944 Implemented
IC0085 # 02 Y:2004 02 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,699 $0 Implemented
IC0085 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,310 $588 Implemented
IC0085 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,624 $456 Not Implemented
IC0085 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,746 $18,000 Implemented
IC0085 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,123 $13,680 Not Implemented
IC0085 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,640 $138,438 Implemented
IC0085 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $2,016 $5,841 Not Implemented
IC0085 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,714 $11,153 Not Implemented
WV0300 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $32,334 $3,536 Not Implemented
WV0300 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,389 $648 Implemented
WV0300 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $11,230 $1,590 Not Implemented
WV0300 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,992 $0 Implemented
WV0300 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,599 $180 Implemented
WV0300 # 06 Y:2004 06 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,689 $1,078 Not Implemented
WV0300 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $3,908 $180 Implemented
WV0300 # 08 Y:2004 08 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,710 $1,875 Not Implemented