IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0417 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $7,797 Not Implemented
AS0417 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $452 $300 Not Implemented
AS0417 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $346 $2,800 Not Implemented
WI0509 # 01 Y:2006 01 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $34,120 $25,000 Not Implemented
WI0509 # 02 Y:2006 02 2006 USE CLEAN IN PLACE (CIP) SYSTEMS $24,741 $37,800 Not Implemented
WI0509 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,741 $0 Not Implemented
WI0509 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,107 $1,000 Not Implemented
WI0509 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $640 Not Implemented
WI0509 # 06 Y:2006 06 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,330 $0 Not Implemented
WI0509 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,189 $0 Not Implemented
WI0509 # 08 Y:2006 08 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,886 $3,886 Not Implemented
WI0509 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $769 $400 Not Implemented
SF0323 # 01 Y:2006 01 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,385 $4,000 Not Implemented
SF0323 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $5,614 $1,181 Not Implemented
SF0323 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,718 $3,434 Implemented
SF0323 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,432 $8,974 Implemented
SF0323 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $5,355 Not Implemented
SF0323 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $117,125 $345,000 Not Implemented
SF0323 # 07 Y:2006 07 2006 INSTALL SKYLIGHTS $13,832 $47,430 Not Implemented
OK0722 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,766 $10,375 Not Implemented
OK0722 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,201 $5,750 Not Implemented
OK0722 # 03 Y:2006 03 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $266 $521 Implemented
OK0722 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,193 $40 Implemented
OK0722 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $1,300 Not Implemented
OK0722 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,157 $15,330 Not Implemented