Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1054 # 10 Y:2023 | 10 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,467 | $7,400 | Not Implemented |
UD1054 # 11 Y:2023 | 11 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,768,755 | $300,000 | Not Implemented |
UD1009 # 05 Y:2020 | 05 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $107,302 | $83,000 | Implemented |
UD1009 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $100,517 | $151,300 | Not Implemented |
UD1009 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,717 | $4,388 | Implemented |
UD1009 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $78,282 | $44,250 | Not Implemented |
UD1009 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,826 | $1,000 | Implemented |
UD1009 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,116 | $0 | Implemented |
UD1009 # 07 Y:2020 | 07 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $73,844 | $147,736 | Not Implemented |
UD0961 # 03 Y:2017 | 03 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,272 | $4,748 | Not Implemented |
UD0961 # 01 Y:2017 | 01 | 2017 | USE RADIANT HEATER FOR SPOT HEATING | $23,931 | $14,250 | Not Implemented |
UD0961 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,308 | $0 | Not Implemented |
UD0961 # 04 Y:2017 | 04 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,969 | $23,750 | Not Implemented |
UD0961 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,937 | $1,000 | Not Implemented |
UD0961 # 06 Y:2017 | 06 | 2017 | REDUCE FLUID FLOW RATES | $5,273 | $1,000 | Not Implemented |
UD0961 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,802 | $3,700 | Not Implemented |
UD0961 # 08 Y:2017 | 08 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,094 | $103,500 | Not Implemented |
UD0950 # 12 Y:2016 | 12 | 2016 | OPTIMIZE PLANT POWER FACTOR | $1,295 | $6,540 | Not Implemented |
UD0950 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $1,000 | Implemented |
UD0950 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,530 | $4,047 | Not Implemented |
UD0950 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,004 | $1,452 | Not Implemented |
UD0950 # 06 Y:2016 | 06 | 2016 | REDUCE EXCESSIVE BOILER BLOWDOWN | $195 | $0 | Not Implemented |
UD0950 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $671 | $1,116 | Not Implemented |
UD0950 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,050 | $671 | Not Implemented |
UD0950 # 03 Y:2016 | 03 | 2016 | INSTALL TURBULATORS | $1,055 | $1,875 | Not Implemented |