IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1054 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $1,467 $7,400 Not Implemented
UD1054 # 11 Y:2023 11 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,768,755 $300,000 Not Implemented
UD1009 # 05 Y:2020 05 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $107,302 $83,000 Implemented
UD1009 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $100,517 $151,300 Not Implemented
UD1009 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,717 $4,388 Implemented
UD1009 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $78,282 $44,250 Not Implemented
UD1009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,826 $1,000 Implemented
UD1009 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,116 $0 Implemented
UD1009 # 07 Y:2020 07 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $73,844 $147,736 Not Implemented
UD0961 # 03 Y:2017 03 2017 DEVELOP A REPAIR/REPLACE POLICY $1,272 $4,748 Not Implemented
UD0961 # 01 Y:2017 01 2017 USE RADIANT HEATER FOR SPOT HEATING $23,931 $14,250 Not Implemented
UD0961 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,308 $0 Not Implemented
UD0961 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,969 $23,750 Not Implemented
UD0961 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,937 $1,000 Not Implemented
UD0961 # 06 Y:2017 06 2017 REDUCE FLUID FLOW RATES $5,273 $1,000 Not Implemented
UD0961 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,802 $3,700 Not Implemented
UD0961 # 08 Y:2017 08 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,094 $103,500 Not Implemented
UD0950 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $1,295 $6,540 Not Implemented
UD0950 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
UD0950 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,530 $4,047 Not Implemented
UD0950 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,004 $1,452 Not Implemented
UD0950 # 06 Y:2016 06 2016 REDUCE EXCESSIVE BOILER BLOWDOWN $195 $0 Not Implemented
UD0950 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $671 $1,116 Not Implemented
UD0950 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,050 $671 Not Implemented
UD0950 # 03 Y:2016 03 2016 INSTALL TURBULATORS $1,055 $1,875 Not Implemented