IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 326111 Plastics Bag and Pouch Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0269 # 07 Y:2003 07 2003 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $14,907 $640 Not Implemented
NC0269 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,654 $2,400 Implemented
NC0269 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,908 $800 Not Implemented
NC0269 # 04 Y:2003 04 2003 DEVELOP A REPAIR/REPLACE POLICY $4,027 $1,719 Implemented
NC0269 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,974 $9,174 Implemented
NC0269 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $16,965 $5,128 Implemented
NC0269 # 01 Y:2003 01 2003 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $272,200 $118,250 Implemented
NC0260 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,437 $8,000 Not Implemented
NC0260 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $806 $550 Not Implemented
NC0260 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $264 $252 Not Implemented
NC0260 # 07 Y:2003 07 2003 DEVELOP A REPAIR/REPLACE POLICY $347 $260 Not Implemented
NC0260 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $234 $0 Not Implemented
NC0260 # 05 Y:2003 05 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,263 $16,548 Not Implemented
NC0260 # 04 Y:2003 04 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $606 $176 Not Implemented
NC0260 # 03 Y:2003 03 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $16,074 $9,000 Not Implemented
NC0260 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $396 $208 Not Implemented
NC0261 # 08 Y:2003 08 2003 MODIFY CURRENT INCENTIVE PROGRAM $406,000 $41,000 Not Implemented
NC0261 # 07 Y:2003 07 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $910 $3,948 Not Implemented
NC0261 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,314 $500 Not Implemented
NC0261 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,430 Implemented
NC0261 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $50 Implemented
NC0261 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,615 $5,261 Not Implemented
NC0261 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,622 $2,911 Not Implemented
NC0261 # 01 Y:2003 01 2003 DEVELOP A REPAIR/REPLACE POLICY $10,483 $9,992 Implemented
NC0259 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,879 $1,740 Implemented