IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
NAICS 326112 Plastics Packaging Film and Sheet (including Laminated) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
UU0214 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,558 Implemented
UU0214 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,776 $6,969 Implemented
UW2202 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,645 $10,782 Implemented
UW2202 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,538 $9,763 Implemented
UW2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,233 $12,913 Implemented
UW2202 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,581 $876,160 Implemented
LE0516 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $1,200 Implemented
LE0516 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,118 $11,000 Not Implemented
LE0516 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,511 $200 Implemented
LE0516 # 04 Y:2021 04 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,448 $25,000 Not Implemented
LE0516 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,984 $30,000 Not Implemented
LE0516 # 06 Y:2021 06 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,727 $36,000 Not Implemented
UU0172 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,814 $7,952 Implemented
UU0172 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,268 $212 Implemented
UU0172 # 09 Y:2021 09 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,679 $1,200 Implemented
UU0172 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,439 $15,243 Implemented
UU0172 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,803 $4,803 Not Implemented
UU0172 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $4,999 $3,792 Not Implemented
UU0172 # 06 Y:2021 06 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,039 $17,334 Implemented
UU0172 # 07 Y:2021 07 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,543 $100 Implemented
UU0172 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,200 $5,000 Not Implemented
SD0590 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $319 $585 Implemented
SD0590 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,948 $0 Implemented
SD0590 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $12,001 $8,840 Not Implemented