IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
NAICS 326112 Plastics Packaging Film and Sheet (including Laminated) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0482 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,303 $4,000 Not Implemented
NC0482 # 07 Y:2013 07 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $14,522 $24,104 Not Implemented
NC0482 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,890 $100 Implemented
MZ0098 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,632 $23,700 Implemented
MZ0098 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,267 $26,000 Implemented
MZ0098 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $35,790 $36,000 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
MZ0098 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,896 $3,000 Implemented
MZ0098 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,872 $400 Implemented
MZ0098 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $1,283 Implemented
MZ0098 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,269 $850 Not Implemented
TT0093 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,234 $10,343 Not Implemented
TT0093 # 02 Y:2012 02 2012 INSTALL WIND POWERED ELECTRIC GENERATOR $29,491 $250,000 Not Implemented
TT0093 # 03 Y:2012 03 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,625 $52,000 Implemented
TT0093 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,350 $800 Implemented
TT0093 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,014 $7,685 Implemented
SF0400 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,777 $0 Not Implemented
SF0400 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,056 $0 Not Implemented
SF0400 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,063 $712 Not Implemented
SF0400 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $6,271 $2,850 Not Implemented
SF0400 # 05 Y:2011 05 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,251 $66,975 Not Implemented
SF0400 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $9,933 $14,699 Not Implemented
SF0400 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,404 $22,616 Not Implemented
SF0400 # 08 Y:2011 08 2011 OPTIMIZE PLANT POWER FACTOR $5,731 $15,119 Not Implemented
SF0400 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,700 $41,732 Not Implemented