IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0280 # 11 Y:2019 11 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,072 $1,664 Not Implemented
MZ0280 # 12 Y:2019 12 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $550 Not Implemented
AM0781 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,349 $43 Not Implemented
AM0781 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $6,054 $17,860 Not Implemented
AM0781 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,710 $7,720 Implemented
AM0781 # 04 Y:2019 04 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $762 Not Implemented
AM0781 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $780 Implemented
MI0331 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,963 $15,690 Implemented
MI0331 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $6,044 $5,800 Not Implemented
MI0331 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $2,020 Not Implemented
MI0331 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $4,461 $0 Implemented
MI0331 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,250 $1,400 Implemented
MI0331 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,841 Not Implemented
MI0331 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,868 $531 Not Implemented
MI0331 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $1,823 $340 Not Implemented
MI0331 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $480 Implemented
MI0331 # 10 Y:2018 10 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $962 $2,525 Implemented
MI0331 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $1,875 Implemented
UD0981 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,044 $0 Implemented
UD0981 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,704 $50 Not Implemented
UD0981 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $500 Implemented
UD0981 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,524 $8,000 Not Implemented
UD0981 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,753 $700 Not Implemented
UD0981 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented