IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0080 # 01 Y:2016 01 2016 USE SYNTHETIC LUBRICANT $4,146 $4,500 Not Implemented
WM0080 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $312 $122 Not Implemented
WM0080 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $1,600 Not Implemented
WM0080 # 06 Y:2016 06 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,275 $1,589 Not Implemented
WM0080 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,338 $0 Implemented
WM0080 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,109 $780 Not Implemented
WM0080 # 03 Y:2016 03 2016 USE SYNTHETIC LUBRICANT $3,352 $1,507 Not Implemented
WM0080 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,385 $1,225 Implemented
IA0540 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $24,230 $58,000 Not Implemented
IA0540 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,824 $22,377 Not Implemented
IA0540 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,814 $7,338 Not Implemented
IA0540 # 04 Y:2015 04 2015 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,054 $15,000 Not Implemented
IA0540 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,905 $15,307 Not Implemented
IA0540 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,863 $357 Not Implemented
IA0540 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,669 $265 Not Implemented
IA0540 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,257 $70 Not Implemented
IA0540 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $979 $4,550 Not Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
SU0389 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,788 $0 Not Implemented
SU0389 # 02 Y:2015 02 2015 DISCONNECT BALLASTS $1,418 $0 Not Implemented
SU0389 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $516 $0 Implemented