Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0792 # 11 Y:2009 | 11 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,050 | $0 | Not Implemented |
UM0310 # 01 Y:2006 | 01 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $31,460 | $21,337 | Not Implemented |
UM0310 # 02 Y:2006 | 02 | 2006 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $30,322 | $27,325 | Not Implemented |
UM0310 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,000 | $14,850 | Implemented |
UM0310 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,978 | $375 | Implemented |
UM0310 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,694 | $2,000 | Not Implemented |
UM0310 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,785 | $5,996 | Implemented |
UM0310 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,854 | $225 | Implemented |
WV0309 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $9,618 | $1,147 | Implemented |
WV0309 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,338 | $550 | Implemented |
WV0309 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,461 | $760 | Implemented |
WV0309 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,239 | $8,590 | Implemented |
WV0309 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,140 | $98 | Implemented |
WV0309 # 06 Y:2005 | 06 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,646 | $232 | Implemented |
WV0309 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,551 | $19 | Implemented |
WV0309 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,334 | $1,436 | Not Implemented |
WV0309 # 09 Y:2005 | 09 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,138 | $0 | Implemented |
WV0309 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,066 | $507 | Implemented |
WV0309 # 11 Y:2005 | 11 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,012 | $133 | Implemented |
WV0309 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $512 | $480 | Not Implemented |
WV0309 # 13 Y:2005 | 13 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $374 | $0 | Not Implemented |
WV0309 # 14 Y:2005 | 14 | 2005 | RECOVER AND REUSE COOLING WATER | $12,688 | $5,135 | Not Implemented |
UD0669 # 01 Y:2003 | 01 | 2003 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $122,772 | $91,650 | Not Implemented |
UD0669 # 02 Y:2003 | 02 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $40,428 | $15,550 | Not Implemented |
UD0669 # 03 Y:2003 | 03 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $21,194 | $5,400 | Not Implemented |