IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0582 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $2,331 $1,140 Implemented
LE0582 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $0 Implemented
LE0582 # 03 Y:2024 03 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,934 $5,000 Implemented
LE0582 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,259 $2,600 Implemented
LE0582 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $5,494 Implemented
LE0559 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $704 $450 Implemented
LE0559 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 Implemented
OK1085 # 05 Y:2023 05 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $564 $0 Implemented
OK1085 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $15,984 $2,567 Implemented
OK1085 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,322 $2,730 Implemented
OK1085 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,853 $0 Implemented
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
DL0210 # 02 Y:2022 02 2022 INSTALL SET-BACK TIMERS $14,339 $1,650 Implemented
LE0517 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $125 $480 Implemented
LE0517 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $603 $40 Implemented
LE0517 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $52,000 $100,000 Implemented
AM0837 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,092 $1,225 Implemented
AM0837 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $955 $75 Implemented
AM0837 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $197 $0 Implemented
DL0198 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,850 $0 Implemented
DL0198 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,800 $0 Implemented
DL0198 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,240 $2,500 Implemented
DL0198 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,740 $14,428 Implemented
DL0196 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,842 $2,864 Implemented
DL0196 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $849 $0 Implemented