IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0488 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,665 $9,243 Implemented
WV0488 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $327 $221 Implemented
WV0488 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,681 $1,893 Implemented
WV0488 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $120 Implemented
WV0488 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $444 $320 Implemented
WV0488 # 03 Y:2014 03 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,735 $214 Implemented
WV0488 # 07 Y:2014 07 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,003 $1,000 Implemented
UD0895 # 05 Y:2014 05 2014 ADD AREA LIGHTING SWITCHES $1,613 $1,575 Implemented
UD0895 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,520 $4,275 Implemented
UD0895 # 09 Y:2014 09 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,388 $800 Implemented
UD0895 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,823 $16,000 Implemented
UD0895 # 07 Y:2014 07 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $249 $510 Implemented
UD0895 # 04 Y:2014 04 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,209 $0 Implemented
UD0895 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $48,509 $7,500 Implemented
UD0895 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,208 $0 Implemented
UD0895 # 01 Y:2014 01 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $72,083 $0 Implemented
UD0875 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,013 $0 Implemented
UD0807 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,275 $2,000 Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
UD0807 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,249 $4,614 Implemented
UD0807 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,425 $8,602 Implemented
UD0807 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $1,000 Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented
UM0310 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,978 $375 Implemented
UM0310 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $5,996 Implemented