Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsNAICS | 326122 | Plastics Pipe and Pipe Fitting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0305 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,350 | $93,000 | Implemented |
MZ0305 # 05 Y:2021 | 05 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,340 | $5,200 | Implemented |
MZ0305 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $579 | $320 | Implemented |
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |
MZ0305 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,692 | $44,928 | Implemented |
WV0596 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,079 | $10,000 | Implemented |
WV0596 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,186 | $20,034 | Implemented |
WV0596 # 12 Y:2020 | 12 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,108 | $1,828 | Implemented |
WV0596 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $7,560 | $7,967 | Implemented |
WV0596 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,729 | $1,600 | Implemented |
WV0596 # 15 Y:2020 | 15 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $507 | $700 | Implemented |
WV0596 # 14 Y:2020 | 14 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $626 | $4,034 | Implemented |
WV0596 # 13 Y:2020 | 13 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $60 | Implemented |
WV0596 # 09 Y:2020 | 09 | 2020 | INSULATE BARE EQUIPMENT | $2,311 | $1,566 | Implemented |
WV0596 # 16 Y:2020 | 16 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $326 | $1,500 | Implemented |
WV0596 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,754 | $7,949 | Implemented |
WV0596 # 01 Y:2020 | 01 | 2020 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $103,798 | $40,718 | Implemented |
WV0596 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $1,750 | $372 | Implemented |
MI0331 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,963 | $15,690 | Implemented |
MI0331 # 04 Y:2018 | 04 | 2018 | PAY UTILITY BILLS ON TIME | $4,461 | $0 | Implemented |
MI0331 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,250 | $1,400 | Implemented |
MI0331 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,540 | $480 | Implemented |
MI0331 # 10 Y:2018 | 10 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $962 | $2,525 | Implemented |
MI0331 # 11 Y:2018 | 11 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $420 | $1,875 | Implemented |
IC0196 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,243 | $13,967 | Implemented |