Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
440
matching recommendationsNAICS | 326122 | Plastics Pipe and Pipe Fitting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0080 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $312 | $122 | Not Implemented |
IA0540 # 01 Y:2015 | 01 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $24,230 | $58,000 | Not Implemented |
IA0540 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,824 | $22,377 | Not Implemented |
IA0540 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,814 | $7,338 | Not Implemented |
IA0540 # 04 Y:2015 | 04 | 2015 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,054 | $15,000 | Not Implemented |
IA0540 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,905 | $15,307 | Not Implemented |
IA0540 # 06 Y:2015 | 06 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,863 | $357 | Not Implemented |
IA0540 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,669 | $265 | Not Implemented |
IA0540 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,257 | $70 | Not Implemented |
IA0540 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $979 | $4,550 | Not Implemented |
OK0921 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,838 | $28,060 | Implemented |
OK0921 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,026 | $832 | Not Implemented |
OK0921 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $13,915 | $4,348 | Implemented |
OK0921 # 04 Y:2015 | 04 | 2015 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $89,313 | $72,000 | Implemented |
OK0921 # 05 Y:2015 | 05 | 2015 | REDUCE FLUID FLOW RATES | $32,332 | $5,000 | Implemented |
OK0916 # 01 Y:2015 | 01 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $12,740 | $0 | Implemented |
OK0916 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,433 | $20,074 | Not Implemented |
OK0916 # 03 Y:2015 | 03 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,382 | $0 | Implemented |
OK0916 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,579 | $3,451 | Implemented |
OK0916 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $390 | $1,805 | Not Implemented |
OK0916 # 06 Y:2015 | 06 | 2015 | DISCONNECT BALLASTS | $2,547 | $2,064 | Not Implemented |
OK0916 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,606 | $5,687 | Not Implemented |
OK0916 # 08 Y:2015 | 08 | 2015 | OPTIMIZE PLANT POWER FACTOR | $3,788 | $26,134 | Not Implemented |
OK0916 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,642 | $1,150 | Implemented |
OK0916 # 10 Y:2015 | 10 | 2015 | INSULATE BARE EQUIPMENT | $11,269 | $12,672 | Not Implemented |