Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsNAICS | 32614 | Polystyrene Foam Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0111 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,637 | $100 | Implemented |
WM0029 # 02 Y:2013 | 02 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,542 | $1,240 | Implemented |
WM0029 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,925 | $4,915 | Implemented |
WM0029 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,633 | $644 | Implemented |
MA0703 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,588 | $9,425 | Implemented |
MA0703 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $100 | Implemented |
MA0703 # 09 Y:2012 | 09 | 2012 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $332 | $150 | Implemented |
UM0379 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,353 | $14,633 | Implemented |
UM0379 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $2,000 | Implemented |
UM0379 # 03 Y:2010 | 03 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $229 | $10 | Implemented |
UM0379 # 04 Y:2010 | 04 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,060 | $1,500 | Implemented |
UM0379 # 05 Y:2010 | 05 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,283 | $9,861 | Implemented |
UM0379 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,989 | $1,350 | Implemented |
DL0014 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,600 | $0 | Implemented |
UF0404 # 01 Y:2007 | 01 | 2007 | USE OPTIMUM THICKNESS INSULATION | $45,739 | $1,287 | Implemented |
UF0404 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $10,863 | $369 | Implemented |
UF0404 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $603 | $230 | Implemented |
UF0404 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,133 | $15,174 | Implemented |
UF0404 # 07 Y:2007 | 07 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,571 | $15,174 | Implemented |
UF0404 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,000 | $270 | Implemented |
SF0323 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,718 | $3,434 | Implemented |
SF0323 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,432 | $8,974 | Implemented |
AM0493 # 01 Y:2005 | 01 | 2005 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $33,171 | $10,165 | Implemented |
AM0493 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,020 | $500 | Implemented |
AM0493 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $7,410 | $19,235 | Implemented |