IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
NAICS 32615 Urethane and Other Foam Product (except Polystyrene) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0308 # 04 Y:2010 04 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,965 $25,000 Not Implemented
LE0308 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,842 $6,180 Implemented
LE0308 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,037 $1,720 Not Implemented
LE0308 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,146 $700 Not Implemented
LE0308 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $7,344 Not Implemented
LE0308 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,491 $7,592 Not Implemented
LE0308 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $14,300 Not Implemented
TT0049 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,280 $9,600 Not Implemented
TT0049 # 02 Y:2010 02 2010 REPAIR OR REPLACE STEAM TRAPS $9,803 $4,000 Not Implemented
TT0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,257 $50 Not Implemented
TT0049 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $16,200 $18,200 Not Implemented
TT0049 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,756 $173,505 Implemented
TT0049 # 06 Y:2010 06 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,723 $0 Not Implemented
UW0029 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,416 $120,000 Implemented
UW0029 # 02 Y:2009 02 2009 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,263 $17,000 Implemented
UW0029 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $3,269 $3,800 Implemented
UW0029 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,713 $9,934 Implemented
UM0343 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,158 $32,000 Not Implemented
UM0343 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,585 $10,000 Not Implemented
UM0343 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $8,476 $9,576 Not Implemented
UM0343 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $3,750 $0 Implemented
UM0343 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,390 $5,864 Not Implemented
UM0343 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,378 $750 Implemented
UF0415 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $662 $300 Not Implemented
UF0415 # 02 Y:2008 02 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $19,825 $20,000 Not Implemented