IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
NAICS 32615 Urethane and Other Foam Product (except Polystyrene) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0415 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,271 $400 Not Implemented
UF0415 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,736 $30,084 Implemented
UF0415 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $0 Implemented
UF0415 # 06 Y:2008 06 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $27,511 $182,894 Not Implemented
UF0415 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $648 $0 Implemented
UF0415 # 08 Y:2008 08 2008 INSTALL COMMON HEADER ON COMPRESSORS $6,290 $550 Not Implemented
UF0415 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,178 $49,400 Not Implemented
DL0012 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,593 $26,675 Implemented
DL0012 # 02 Y:2008 02 2008 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $19,600 $23,900 Not Implemented
DL0012 # 03 Y:2008 03 2008 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,988 $146 Not Implemented
DL0012 # 04 Y:2008 04 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,766 $16,500 Not Implemented
DL0012 # 05 Y:2008 05 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,154 $0 Not Implemented
DL0012 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,902 $11,000 Not Implemented
UM0325 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $56,621 $14,400 Implemented
UM0325 # 02 Y:2007 02 2007 REDUCE VENTILATION AIR $22,071 $17,000 Not Implemented
UM0325 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $12,908 $3,000 Not Implemented
UM0325 # 04 Y:2007 04 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,212 $0 Implemented
UM0325 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $7,856 $4,379 Not Implemented
UM0325 # 06 Y:2007 06 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,729 $1,620 Implemented
UM0325 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $2,640 Not Implemented
UM0325 # 08 Y:2007 08 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,151 $1,000 Not Implemented
UM0325 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $701 $400 Not Implemented
LE0209 # 01 Y:2005 01 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $669,800 $350,000 Not Implemented
LE0209 # 02 Y:2005 02 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $200,574 $550,000 Not Implemented
LE0209 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $18,034 $95 Implemented