IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0135 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $607 $1,193 Not Implemented
IC0135 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $2,488 $2,904 Not Implemented
IC0135 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,093 $11,558 Not Implemented
IC0135 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,449 $1,380 Not Implemented
IC0135 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $945 $0 Not Implemented
IC0135 # 09 Y:2007 09 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,210 $4,835 Not Implemented
IC0135 # 10 Y:2007 10 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,755 $0 Not Implemented
IC0135 # 11 Y:2007 11 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $849 $0 Not Implemented
UW0008 # 01 Y:2007 01 2007 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $136,932 $492,147 Implemented
UW0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,830 $81,585 Implemented
UW0008 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,480 $11,244 Implemented
UW0008 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,092 $700 Implemented
UW0008 # 05 Y:2007 05 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $231 $650 Not Implemented
BD0332 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $20,588 $1,951 Not Implemented
BD0332 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $608 $1,401 Not Implemented
BD0332 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $476 Not Implemented
BD0332 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $2 Not Implemented
BD0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $496 $351 Not Implemented
BD0332 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $23,837 $40,001 Not Implemented
BD0332 # 07 Y:2007 07 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,182 $2 Not Implemented
SU0260 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,228 $0 Implemented
SU0260 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,676 $0 Not Implemented
SU0260 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,312 $0 Not Implemented
SU0260 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $685 $0 Implemented
SU0260 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,644 $1,034 Implemented