IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS024 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,562 $150 Implemented
MAS024 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,698 $59,484 Not Implemented
MAS024 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,802 $22,500 Not Implemented
MAS024 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $4,676 $2,250 Not Implemented
MAS024 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,749 $0 Implemented
MAS024 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,070 $1,700 Not Implemented
MAS024 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $241 $345 Not Implemented
UM0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,740 $6,369 Implemented
UM0403 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,872 $1,175 Not Implemented
UM0403 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,116 $16,500 Not Implemented
UM0403 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $921 $1,000 Not Implemented
UM0403 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $200 Not Implemented
UM0401 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,538 $1,500 Not Implemented
UM0401 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $5,655 $21,250 Not Implemented
UM0401 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,019 $5,000 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
DL0087 # 01 Y:2012 01 2012 KEEP EQUIPMENT CLEAN $378,860 $370,000 Implemented
DL0087 # 02 Y:2012 02 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $145,934 $700 Not Implemented
DL0087 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $410,000 $1,200,000 Implemented
DL0087 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,000 $78,000 Implemented
DL0087 # 05 Y:2012 05 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,900 $14,000 Implemented
DL0087 # 06 Y:2012 06 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $17,900 $54,500 Not Implemented
DL0087 # 07 Y:2012 07 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,000 $20,000 Not Implemented
DL0087 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $5,400 Implemented
DL0087 # 09 Y:2012 09 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $79,600 $29,600 Not Implemented