IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0357 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $654 Implemented
IA0357 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $657 $262 Implemented
IA0357 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $1,879 $2,445 Implemented
IA0357 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,027 $23 Implemented
IA0357 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $25 Not Implemented
IA0357 # 07 Y:2004 07 2004 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $206,874 $145,850 Implemented
IA0357 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,225 $349 Implemented
OR0473 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $1,100 $4,000 Not Implemented
OR0473 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,530 $2,200 Implemented
OR0473 # 01 Y:2004 01 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $7,000 $7,000 Implemented
OR0473 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $7,400 $7,400 Not Implemented
OR0473 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $1,500 Implemented
SD0353 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,343 $2,475 Not Implemented
SD0353 # 06 Y:2004 06 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $15,930 $17,000 Implemented
SD0353 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $3,058 $0 Implemented
SD0353 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $353 $700 Implemented
SD0353 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $7,993 $13,600 Not Implemented
SD0353 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,201 $31,437 Not Implemented
SD0353 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $407 $151 Not Implemented
SD0352 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,768 $28,000 n/a
SD0352 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,377 $360 Implemented
SD0352 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,107 $10,200 Not Implemented
SD0352 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,494 $49,732 Implemented
SD0352 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $820,692 $1,776,190 n/a
SD0352 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,650 $36,750 n/a