Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
229
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0357 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $447 | $654 | Implemented |
IA0357 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $657 | $262 | Implemented |
IA0357 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,879 | $2,445 | Implemented |
IA0357 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,027 | $23 | Implemented |
IA0357 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,125 | $25 | Not Implemented |
IA0357 # 07 Y:2004 | 07 | 2004 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $206,874 | $145,850 | Implemented |
IA0357 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,225 | $349 | Implemented |
OR0473 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,100 | $4,000 | Not Implemented |
OR0473 # 04 Y:2004 | 04 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,530 | $2,200 | Implemented |
OR0473 # 01 Y:2004 | 01 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $7,000 | $7,000 | Implemented |
OR0473 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $7,400 | $7,400 | Not Implemented |
OR0473 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $1,500 | Implemented |
SD0353 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,343 | $2,475 | Not Implemented |
SD0353 # 06 Y:2004 | 06 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $15,930 | $17,000 | Implemented |
SD0353 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,058 | $0 | Implemented |
SD0353 # 03 Y:2004 | 03 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $353 | $700 | Implemented |
SD0353 # 05 Y:2004 | 05 | 2004 | USE PHOTOCELL CONTROLS | $7,993 | $13,600 | Not Implemented |
SD0353 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,201 | $31,437 | Not Implemented |
SD0353 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $407 | $151 | Not Implemented |
SD0352 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,768 | $28,000 | n/a |
SD0352 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,377 | $360 | Implemented |
SD0352 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,107 | $10,200 | Not Implemented |
SD0352 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,494 | $49,732 | Implemented |
SD0352 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $820,692 | $1,776,190 | n/a |
SD0352 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,650 | $36,750 | n/a |