IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 326191 Plastics Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0354 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $983 $200 Implemented
UM0354 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,114 $500 Implemented
UM0354 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,144 $4,200 Implemented
UM0354 # 03 Y:2009 03 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,567 $9,570 Implemented
UM0354 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,778 $8,750 Implemented
UA0026 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,609 $4,200 Implemented
UA0026 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,048 $0 Implemented
UA0026 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $27,831 $950 Implemented
MI0130 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,865 $1,074 Implemented
MI0130 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,895 $3,800 Implemented
MI0130 # 03 Y:2006 03 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,791 $1,020 Implemented
MI0130 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,958 $202 Implemented
MI0130 # 01 Y:2006 01 2006 REDESIGN PROCESS $7,148 $580 Implemented
SD0361 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $390 $170 Implemented
SD0361 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,916 $144 Implemented
SD0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,570 $280 Implemented
SD0358 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,194 $360 Implemented
SD0358 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $550 $1,050 Implemented
SD0358 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $37,125 $52,500 Implemented
SD0358 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,023 $37,287 Implemented
SD0357 # 05 Y:2005 05 2005 AUTOMATE FINISHING PROCESS $189,416 $450,000 Implemented
SD0357 # 06 Y:2005 06 2005 INSTALL SYSTEM TO COLLECT SCRAP $32,128 $29,639 Implemented
SD0357 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $416,473 $750,000 Implemented
SU0204 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $0 Implemented
SU0204 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $3,145 $2,000 Implemented