Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0042 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $340 | Implemented |
MU0004 # 01 Y:2022 | 01 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,123 | $0 | Implemented |
MU0004 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,089 | $4,922 | Implemented |
MU0004 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $845 | $2,773 | Implemented |
MU0004 # 05 Y:2022 | 05 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $250 | $0 | Implemented |
MU0004 # 06 Y:2022 | 06 | 2022 | COMBINE UTILITY METERS | $180 | $0 | Implemented |
MU0004 # 07 Y:2022 | 07 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $58 | $77 | Implemented |
MU0013 # 06 Y:2022 | 06 | 2022 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $51 | $30 | Implemented |
CW0114 # 04 Y:2020 | 04 | 2020 | USE COMPRESSOR AIR FILTERS | $244 | $95 | Implemented |
CW0114 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,504 | $0 | Implemented |
CW0114 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $90 | Implemented |
CW0114 # 02 Y:2020 | 02 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,400 | $0 | Implemented |
UM0447 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $2,500 | Implemented |
UM0447 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,946 | $5,000 | Implemented |
UM0447 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,906 | $1,000 | Implemented |
UM0429 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,321 | $5,000 | Implemented |
UM0429 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,689 | $59,040 | Implemented |
UM0429 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,525 | $1,000 | Implemented |
UM0403 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,740 | $6,369 | Implemented |
UM0401 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,019 | $5,000 | Implemented |
UM0401 # 04 Y:2012 | 04 | 2012 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,066 | $448 | Implemented |
UM0317 # 01 Y:2007 | 01 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $24,281 | $50,000 | Implemented |
UM0317 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $14,750 | $1,970 | Implemented |
UM0317 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $9,662 | $6,000 | Implemented |
UM0317 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,666 | $828 | Implemented |