IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0366 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,553 $200 Not Implemented
SD0366 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,250 $160 Implemented
SD0366 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $900 Not Implemented
SD0366 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $695 $0 Implemented
SD0366 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,771 $17,633 Not Implemented
SD0366 # 08 Y:2005 08 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,248 $10,000 Not Implemented
SD0366 # 09 Y:2005 09 2005 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $19,018 $24,500 Implemented
SD0366 # 10 Y:2005 10 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $98,038 $1,964 Implemented
SD0366 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $2,758 $3,500 Implemented
LM0097 # 01 Y:2005 01 2005 DEVELOP STANDARD OPERATING PROCEDURES $48,120 $4,921 Implemented
LM0097 # 02 Y:2005 02 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,000 $6,000 Not Implemented
LM0097 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $166,760 $6,090 Not Implemented
LM0097 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $53,375 $1,500 Implemented
LM0097 # 05 Y:2005 05 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $1,250 $0 Implemented
LM0097 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $284 $50 Implemented
LM0097 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $933 $35,082 Implemented
SD0353 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,343 $2,475 Not Implemented
SD0353 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $407 $151 Not Implemented
SD0353 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $353 $700 Implemented
SD0353 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,201 $31,437 Not Implemented
SD0353 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $7,993 $13,600 Not Implemented
SD0353 # 06 Y:2004 06 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $15,930 $17,000 Implemented
SD0353 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $3,058 $0 Implemented
SD0352 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $820,692 $1,776,190 n/a
SD0352 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,650 $36,750 n/a