IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0352 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,672 $0 Not Implemented
SD0352 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,107 $10,200 Not Implemented
SD0352 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,768 $28,000 n/a
SD0352 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,493 $7,900 Not Implemented
SD0352 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,377 $360 Implemented
SD0352 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,494 $49,732 Implemented
SD0352 # 09 Y:2004 09 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,648 $18,500 Not Implemented
SD0348 # 01 Y:2004 01 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,921 $12,655 Not Implemented
SD0348 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,682 $2,600 Not Implemented
SD0348 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $747 Not Implemented
SD0348 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $1,538 $1,720 Not Implemented
SD0348 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,553 $18,500 Not Implemented
SD0348 # 06 Y:2004 06 2004 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $70,166 $43,083 Not Implemented
SD0348 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $2,935 $3,500 Not Implemented
LM0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $410 Not Implemented
LM0079 # 02 Y:2004 02 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $846 $30 Not Implemented
LM0079 # 03 Y:2004 03 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,758 $8,250 Not Implemented
LM0079 # 04 Y:2004 04 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,000 $3,122 Not Implemented
LM0079 # 05 Y:2004 05 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,045 $0 Not Implemented
LM0075 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $175 Implemented
LM0075 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,356 $1,854 Not Implemented
LM0075 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $552 $779 Not Implemented
LM0075 # 04 Y:2004 04 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $156,419 $6,500 Implemented
LM0075 # 05 Y:2004 05 2004 DEVELOP STANDARD OPERATING PROCEDURES $14,640 $6,500 Not Implemented
LM0075 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $309 $101 Implemented