IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,656

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0226 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $886 $591 Not Implemented
UD0670 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,320 $4,000 Not Implemented
UD0670 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,300 $5,520 Not Implemented
UD0670 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $20,540 Implemented
UD0670 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,218 $0 Implemented
UD0670 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,644 $3,620 Not Implemented
UD0670 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $1,597 $144 Implemented
UD0670 # 07 Y:2003 07 2003 DISCONNECT BALLASTS $1,367 $70 Implemented
UD0670 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,243 $2,500 Not Implemented
UD0670 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $813 $1,458 Implemented
UD0670 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $730 $160 Not Implemented
AM0438 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $12,900 $18,200 Implemented
AM0438 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,900 $0 Implemented
AM0438 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,700 $0 Implemented
AM0438 # 04 Y:2003 04 2003 RECOVER AND REUSE WASTE MATERIAL $2,350 $0 Implemented
AM0438 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $260 $60 Not Implemented
AS0352 # 01 Y:2003 01 2003 INSTALL SKYLIGHTS $1,977 $4,374 Not Implemented
AS0352 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $402 $1,000 Implemented
AS0352 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,619 $120 Implemented
AS0352 # 04 Y:2003 04 2003 USE HEAT PUMP FOR SPACE CONDITIONING $4,075 $700 Not Implemented
AS0352 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $194 $0 Implemented
AS0352 # 06 Y:2003 06 2003 $29,631 $1,380 Implemented
AS0352 # 07 Y:2003 07 2003 $12,132 $9,260 Implemented
UD0667 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,330 $21,177 Not Implemented
UD0667 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,500 $13,580 Not Implemented