Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
486
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0578 # 04 Y:2019 | 04 | 2019 | USE EVAPORATION TO CONCENTRATE MATERIAL | $6,422 | $11,000 | Not Implemented |
WV0578 # 03 Y:2019 | 03 | 2019 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,677 | $17,920 | Not Implemented |
WV0578 # 02 Y:2019 | 02 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $13,935 | $4,000 | Not Implemented |
WV0578 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $49,796 | $9,417 | Not Implemented |
WV0566 # 10 Y:2018 | 10 | 2018 | INSULATE BARE EQUIPMENT | $114 | $180 | Implemented |
WV0566 # 09 Y:2018 | 09 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $50 | Implemented |
WV0566 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,023 | $500 | Not Implemented |
WV0566 # 07 Y:2018 | 07 | 2018 | MINIMIZE WATER USAGE | $1,217 | $3,150 | Implemented |
WV0566 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,581 | $575 | Implemented |
WV0566 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,643 | $5,200 | Not Implemented |
WV0566 # 04 Y:2018 | 04 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,029 | $500 | Implemented |
WV0566 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,255 | $600 | Implemented |
WV0566 # 02 Y:2018 | 02 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $4,621 | $945 | Implemented |
WV0566 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,590 | $114,000 | Not Implemented |
WV0563 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $264 | $235 | Implemented |
WV0563 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,202 | $1,400 | Implemented |
WV0563 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,206 | $59,750 | Not Implemented |
WV0563 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $20,002 | $754 | Implemented |
WV0563 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,888 | $173,323 | Not Implemented |
WV0563 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,489 | $54,000 | Not Implemented |
WV0563 # 01 Y:2018 | 01 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $85,272 | $36,000 | Not Implemented |
UD0971 # 03 Y:2017 | 03 | 2017 | COVER OPEN TANKS | $8,336 | $2,760 | Not Implemented |
UD0971 # 02 Y:2017 | 02 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $10,210 | $50 | Not Implemented |
UD0971 # 04 Y:2017 | 04 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $972 | $50 | Implemented |
UD0971 # 05 Y:2017 | 05 | 2017 | ADD AREA LIGHTING SWITCHES | $2,213 | $500 | Not Implemented |