IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0797 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,893 $3,800 Implemented
GT0797 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,440 $1,500 Implemented
GT0797 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $121,511 $243,073 Implemented
GT0797 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,210 $17,150 Not Implemented
GT0797 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $500 Implemented
GT0797 # 06 Y:2005 06 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,716 $400 Implemented
GT0797 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,447 $3,692 Implemented
GT0786 # 01 Y:2004 01 2004 MAINTAIN MACHINES TO REDUCE LEAKS $121,900 $45,000 Implemented
GT0786 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $33,950 $38,000 Not Implemented
GT0786 # 03 Y:2004 03 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $33,280 $25,000 Not Implemented
GT0786 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,700 $22,500 Not Implemented
GT0786 # 05 Y:2004 05 2004 CLEAN CONDENSER TUBES $22,690 $3,000 Implemented
GT0786 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,500 $0 Not Implemented
GT0786 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,600 $35 Implemented
GT0786 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $3,737 Not Implemented
GT0763 # 01 Y:2003 01 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,000 $1,350 Implemented
GT0763 # 02 Y:2003 02 2003 KEEP EQUIPMENT CLEAN $655 $0 Implemented
GT0763 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $696 $1,680 Not Implemented
GT0763 # 04 Y:2003 04 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $81 $110 Implemented
GT0763 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,266 $11,300 Not Implemented
GT0763 # 06 Y:2003 06 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,086 $7,250 Not Implemented
GT0763 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,795 $12,447 Not Implemented
GT0763 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,503 $19,339 Implemented
GT0763 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $536 $5,146 Implemented
GT0763 # 10 Y:2003 10 2003 CONTROL PRESSURE ON STEAMER OPERATIONS $11,010 $5,823 Not Implemented