IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0267 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,641 $10,047 Not Implemented
SF0267 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,638 $877 Not Implemented
SF0267 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,968 $3,164 Not Implemented
SF0267 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,510 $0 Implemented
SF0267 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,672 $0 Implemented
UM0242 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,170 Not Implemented
UM0242 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $4,180 $645 Not Implemented
UM0242 # 04 Y:2003 04 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,040 $1,100 Not Implemented
UM0242 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,670 $300 Not Implemented
UM0242 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,195 $1,000 Not Implemented
UM0242 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $9,740 $6,270 Not Implemented
WI0451 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,048 $1,280 Not Implemented
WI0451 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,005 $1,400 Not Implemented
WI0451 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $754 $294 Not Implemented
WI0451 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,486 $500 Not Implemented
WI0451 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,847 $3,433 Not Implemented
WI0451 # 02 Y:2003 02 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $14,092 $36,000 Not Implemented
WI0451 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $21,502 $30,000 Not Implemented
UM0241 # 01 Y:2003 01 2003 $573,000 $390,000 Not Implemented
UM0241 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,350 $8,000 Implemented
UM0241 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,900 $4,800 Not Implemented
UM0241 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $10,510 Implemented
UM0241 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,275 $2,100 Implemented
UM0241 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $75 Implemented
CO0527 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,000 $15,440 Not Implemented