Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0702 # 04 Y:2018 | 04 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,065 | $5,807 | Not Implemented |
OR0702 # 03 Y:2018 | 03 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,409 | $1,005 | Not Implemented |
OR0702 # 02 Y:2018 | 02 | 2018 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,088 | $660 | Not Implemented |
OR0702 # 01 Y:2018 | 01 | 2018 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $20,800 | $7,140 | Not Implemented |
OR0673 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,117 | $5,344 | Implemented |
OR0673 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $157,793 | $301,613 | Not Implemented |
OR0673 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $102,571 | $10,390 | Not Implemented |
OR0673 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $4,333 | $229 | Not Implemented |
OR0673 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,464 | $0 | Implemented |
OR0593 # 01 Y:2012 | 01 | 2012 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $72,379 | $43,800 | Not Implemented |
OR0593 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,751 | $4,751 | Implemented |
OR0593 # 03 Y:2012 | 03 | 2012 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $2,514 | $900 | Not Implemented |
OR0593 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $930 | $2,250 | Not Implemented |
OR0593 # 05 Y:2012 | 05 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,590 | $34,684 | Not Implemented |
UW0010 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,340 | $3,000 | Not Implemented |
UW0010 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,108 | $4,160 | Implemented |
UW0010 # 02 Y:2008 | 02 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,398 | $75,533 | Not Implemented |
UW0008 # 01 Y:2007 | 01 | 2007 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $136,932 | $492,147 | Implemented |
UW0008 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,830 | $81,585 | Implemented |
UW0008 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,480 | $11,244 | Implemented |
UW0008 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $1,092 | $700 | Implemented |
UW0008 # 05 Y:2007 | 05 | 2007 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $231 | $650 | Not Implemented |
OR0473 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,100 | $4,000 | Not Implemented |
OR0473 # 04 Y:2004 | 04 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,530 | $2,200 | Implemented |
OR0473 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $1,500 | Implemented |