Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
556
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0597 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,699 | $4,994 | Implemented |
UU0219 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,112 | $13,345 | Implemented |
NL0078 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,587 | $2,300 | Implemented |
NL0078 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $658 | $80 | Implemented |
NL0078 # 01 Y:2023 | 01 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $31,345 | $100,000 | Implemented |
NL0078 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $415 | Implemented |
NL0078 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,358 | $17,280 | Implemented |
NL0078 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $812 | $2,080 | Implemented |
NL0078 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $128 | $250 | Implemented |
MA0853 # 03 Y:2023 | 03 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,672 | $30,500 | Implemented |
MA0853 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,613 | $59,377 | Implemented |
MA0853 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,202 | $18,988 | Implemented |
MA0853 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,336 | $24,300 | Implemented |
AM0862 # 06 Y:2023 | 06 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,203 | $4,750 | Implemented |
AM0862 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,080 | $16,563 | Implemented |
AM0862 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $80,175 | $8,170 | Implemented |
AM0862 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $27,516 | $41,926 | Implemented |
AM0862 # 03 Y:2023 | 03 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $18,325 | $6,300 | Implemented |
UL2211 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,765 | $0 | Implemented |
UL2211 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,815 | $0 | Implemented |
UL2211 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $61,887 | $45,461 | Implemented |
MU0012 # 01 Y:2022 | 01 | 2022 | INSULATE BARE EQUIPMENT | $25,256 | $31 | Implemented |
MU0012 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $415 | $425 | Implemented |
AM0853 # 09 Y:2022 | 09 | 2022 | USE SYNTHETIC LUBRICANT | $830 | $500 | Implemented |
AM0853 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,530 | $13,140 | Implemented |