Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
604
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0602 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $26,608 | $0 | Implemented |
UF0602 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $268,820 | $137,250 | Implemented |
UF0602 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $339,285 | $786,250 | Implemented |
UF0602 # 02 Y:2023 | 02 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $389,519 | $50,482 | Implemented |
WV0653 # 13 Y:2023 | 13 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,757 | $1,288 | Implemented |
WV0653 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $1,621 | $787 | Implemented |
WV0653 # 15 Y:2023 | 15 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,200 | $3,036 | Implemented |
WV0653 # 14 Y:2023 | 14 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,320 | $1,500 | Implemented |
WV0653 # 11 Y:2023 | 11 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,758 | $2,675 | Implemented |
WV0653 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,884 | $14,800 | Implemented |
WV0653 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $10,683 | $9,567 | Implemented |
WV0653 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,961 | $800 | Implemented |
WV0653 # 06 Y:2023 | 06 | 2023 | MINIMIZE WATER USAGE | $13,630 | $45,516 | Implemented |
WV0653 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,555 | $52,800 | Implemented |
WV0653 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $38,158 | $64,250 | Implemented |
UF0597 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,612 | $25,370 | Implemented |
UF0597 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,876 | $14,705 | Implemented |
UF0597 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,736 | $15,722 | Implemented |
UF0597 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,142 | $22,000 | Implemented |
UF0597 # 05 Y:2023 | 05 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,959 | $11,134 | Implemented |
UF0597 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,382 | $13,706 | Implemented |
UF0597 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,699 | $4,994 | Implemented |
UF0597 # 09 Y:2023 | 09 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $35,500 | $4,261 | Implemented |
UF0597 # 08 Y:2023 | 08 | 2023 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $51,744 | $18,218 | Implemented |
UU0219 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,112 | $13,345 | Implemented |