Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0334 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,612 | $0 | Implemented |
UF0334 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,095 | $2,128 | Implemented |
UF0334 # 05 Y:2003 | 05 | 2003 | SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS | $33,833 | $43,600 | Implemented |
UF0334 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,397 | $57,060 | Implemented |
UF0334 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $82,333 | $168,000 | Implemented |
UF0334 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,681 | $376 | Implemented |
OK0671 # 07 Y:2003 | 07 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $114,000 | $86,000 | Implemented |
OK0671 # 06 Y:2003 | 06 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,592 | $9,500 | Not Implemented |
OK0671 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,789 | $5,340 | Implemented |
OK0671 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $459 | $863 | Implemented |
OK0671 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $880 | $318 | Implemented |
OK0671 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,474 | $12,625 | n/a |
OK0671 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,945 | $4,565 | Implemented |
NC0265 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,793 | $7,000 | Implemented |
NC0265 # 02 Y:2003 | 02 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,226 | $24,506 | Implemented |
NC0265 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,348 | $3,525 | Implemented |
NC0265 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,206 | $1,100 | Not Implemented |
NC0265 # 05 Y:2003 | 05 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $7,094 | $1,000 | Implemented |
NC0265 # 06 Y:2003 | 06 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,361 | $0 | Implemented |
NC0265 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,469 | $300 | Implemented |
NC0265 # 08 Y:2003 | 08 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $214 | $50 | Implemented |
NC0265 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $100 | $89 | Implemented |
UU0048 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $440 | $432 | Not Implemented |
UU0048 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,985 | $306 | Not Implemented |
UU0048 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,920 | $40,000 | Not Implemented |