Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0015 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,011 | $16,913 | Not Implemented |
TT0015 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,236 | $99,598 | Not Implemented |
TT0015 # 03 Y:2007 | 03 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $2,000 | $1,600 | Implemented |
TT0015 # 02 Y:2007 | 02 | 2007 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $17,800 | $35,600 | Not Implemented |
TT0015 # 01 Y:2007 | 01 | 2007 | OPTIMIZE PLANT POWER FACTOR | $8,343 | $10,000 | Not Implemented |
MI0158 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,478 | $5,967 | Not Implemented |
MI0158 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,963 | $20,900 | Implemented |
MI0158 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $13,330 | $1,700 | Implemented |
MI0158 # 02 Y:2007 | 02 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $55,437 | $101,347 | Implemented |
MI0158 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,507 | $1,210 | Implemented |
MI0158 # 01 Y:2007 | 01 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $92,023 | $8,580 | Implemented |
MI0158 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,358 | $46,238 | Not Implemented |
MI0158 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,886 | $2,000 | Implemented |
MI0158 # 08 Y:2007 | 08 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,282 | $3,475 | Not Implemented |
MI0158 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,073 | $40 | Implemented |
MS0322 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $180,588 | $443,666 | Not Implemented |
MS0322 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $979 | $480 | Implemented |
MS0322 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,921 | $17,102 | Not Implemented |
MS0322 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,530 | $4,972 | Not Implemented |
MS0322 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,977 | $662 | Implemented |
MS0322 # 01 Y:2007 | 01 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $573,726 | $6,271,690 | Not Implemented |
TT0012 # 03 Y:2007 | 03 | 2007 | Leaks and Insulation | $9,860 | $1,491 | Implemented |
TT0012 # 06 Y:2007 | 06 | 2007 | $648 | $1,275 | Not Implemented | |
TT0012 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,237 | $200 | Implemented |
TT0012 # 08 Y:2007 | 08 | 2007 | $2,490 | $1,019 | Not Implemented |