Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
281
matching recommendationsNAICS | 32622 | Rubber and Plastics Hoses and Belting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0002 # 03 Y:2007 | 03 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $35,628 | $600 | Implemented |
UA0002 # 04 Y:2007 | 04 | 2007 | METER WASTE WATER | $6,725 | $0 | Not Implemented |
UA0002 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,648 | $15,057 | Not Implemented |
UA0002 # 06 Y:2007 | 06 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $11,078 | $3,916 | Implemented |
UD0723 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,840 | $65,105 | Implemented |
UD0723 # 02 Y:2005 | 02 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,430 | $0 | Implemented |
UD0723 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,394 | $0 | Not Implemented |
UD0723 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,315 | $13,340 | Implemented |
UD0723 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,126 | $7,000 | Implemented |
UD0723 # 06 Y:2005 | 06 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $0 | Not Implemented |
UD0723 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,573 | $0 | Implemented |
UD0723 # 08 Y:2005 | 08 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,309 | $0 | Implemented |
UD0723 # 09 Y:2005 | 09 | 2005 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $3,070 | $2,000 | Not Implemented |
UD0723 # 10 Y:2005 | 10 | 2005 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,730 | $0 | Not Implemented |
UD0723 # 11 Y:2005 | 11 | 2005 | INSULATE BARE EQUIPMENT | $2,650 | $2,629 | Implemented |
UD0723 # 12 Y:2005 | 12 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,164 | $0 | Implemented |
UD0723 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,423 | $500 | Not Implemented |
UD0723 # 14 Y:2005 | 14 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $840 | $0 | Not Implemented |
UD0723 # 15 Y:2005 | 15 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $522 | $0 | Implemented |
NC0313 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,148 | $15,000 | Not Implemented |
NC0313 # 02 Y:2005 | 02 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $17,625 | $50,000 | Not Implemented |
NC0313 # 03 Y:2005 | 03 | 2005 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,261 | $2,000 | Implemented |
NC0313 # 04 Y:2005 | 04 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $7,578 | $200 | Not Implemented |
NC0313 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $274 | $100 | Implemented |
NC0305 # 01 Y:2004 | 01 | 2004 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $36,051 | $3,500 | Not Implemented |