IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
Reset
NAICS 326220 Rubber and Plastics Hoses and Belting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0723 # 09 Y:2005 09 2005 REDUCE WATER USE WITH COUNTER CURRENT RINSING $3,070 $2,000 Not Implemented
UD0723 # 10 Y:2005 10 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,730 $0 Not Implemented
UD0723 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $2,650 $2,629 Implemented
UD0723 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,164 $0 Implemented
UD0723 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,423 $500 Not Implemented
UD0723 # 14 Y:2005 14 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $840 $0 Not Implemented
UD0723 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $522 $0 Implemented
NC0313 # 01 Y:2005 01 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,148 $15,000 Not Implemented
NC0313 # 02 Y:2005 02 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $17,625 $50,000 Not Implemented
NC0313 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $10,261 $2,000 Implemented
NC0313 # 04 Y:2005 04 2005 USE MINIMUM STEAM OPERATING PRESSURE $7,578 $200 Not Implemented
NC0313 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $274 $100 Implemented
NC0305 # 01 Y:2004 01 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $36,051 $3,500 Not Implemented
NC0305 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,108 $200 Not Implemented
NC0305 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,452 $2,000 Not Implemented
NC0305 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,897 $2,750 Not Implemented
NC0305 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $2,802 $1,000 Not Implemented
NC0305 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $349 $100 Implemented
NC0305 # 07 Y:2004 07 2004 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $320 $58 Implemented
UF0334 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,397 $57,060 Implemented
UF0334 # 02 Y:2003 02 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,095 $2,128 Implemented
UF0334 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,612 $0 Implemented
UF0334 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,681 $376 Implemented
UF0334 # 05 Y:2003 05 2003 SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS $33,833 $43,600 Implemented
UF0334 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $82,333 $168,000 Implemented