IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

889

matching recommendations
Reset
NAICS 32629 Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0594 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,354 $121,835 Implemented
MA0594 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $40,484 $141,413 Not Implemented
MA0594 # 04 Y:2006 04 2006 REPAIR OR REPLACE STEAM TRAPS $11,241 $7,665 Not Implemented
MA0594 # 05 Y:2006 05 2006 REDUCE VENTILATION AIR $5,860 $3,505 Implemented
MA0594 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,046 $0 Implemented
MA0594 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $3,159 $5,681 Not Implemented
MA0594 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,600 $500 Not Implemented
SD0364 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $17,315 Implemented
SD0364 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,150 $5,650 Not Implemented
SD0364 # 03 Y:2005 03 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,260 $6,300 Implemented
SD0364 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,016 $440 Implemented
SD0364 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $413 $400 Not Implemented
MA0561 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,924 $75,720 Implemented
MA0561 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,006 $25,500 Implemented
MA0561 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,624 $4,550 Implemented
MA0561 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $6,815 $4,530 Implemented
MA0561 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $3,147 $735 Implemented
MA0561 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,473 $2,750 Implemented
BD0268 # 01 Y:2004 01 2004 AIR CONDITION ONLY SPACE NECESSARY $352,557 $1,500,000 Implemented
BD0268 # 02 Y:2004 02 2004 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $81,415 $130,000 Implemented
BD0268 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $40,434 $49,000 Implemented
BD0268 # 04 Y:2004 04 2004 HEAT WATER WITH EXHAUST HEAT $31,790 $35,000 Implemented
BD0268 # 05 Y:2004 05 2004 ADD AREA LIGHTING SWITCHES $14,266 $9,000 Not Implemented
BD0268 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $200 Implemented
BD0268 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,701 $1,500 Implemented