Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
492
matching recommendationsNAICS | 326299 | All Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0594 # 06 Y:2006 | 06 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,046 | $0 | Implemented |
MA0594 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $3,159 | $5,681 | Not Implemented |
MA0594 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,600 | $500 | Not Implemented |
SD0364 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,817 | $17,315 | Implemented |
SD0364 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,150 | $5,650 | Not Implemented |
SD0364 # 03 Y:2005 | 03 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,260 | $6,300 | Implemented |
SD0364 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,016 | $440 | Implemented |
SD0364 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $413 | $400 | Not Implemented |
MA0561 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,924 | $75,720 | Implemented |
MA0561 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,006 | $25,500 | Implemented |
MA0561 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,624 | $4,550 | Implemented |
MA0561 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $6,815 | $4,530 | Implemented |
MA0561 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $3,147 | $735 | Implemented |
MA0561 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,473 | $2,750 | Implemented |
WV0299 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $10,724 | $2,060 | Implemented |
WV0299 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,651 | $16,100 | Implemented |
WV0299 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,725 | $1,000 | Implemented |
WV0299 # 04 Y:2004 | 04 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,783 | $1,937 | Implemented |
WV0299 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,704 | $2,175 | Not Implemented |
WV0299 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,363 | $300 | Implemented |
WV0299 # 07 Y:2004 | 07 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,364 | $40 | Not Implemented |
WV0299 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,152 | $160 | Implemented |
WV0299 # 09 Y:2004 | 09 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $3,018 | $430 | Implemented |
WV0299 # 10 Y:2004 | 10 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,406 | $1,320 | Not Implemented |
WV0299 # 11 Y:2004 | 11 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,387 | $640 | Implemented |