IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,185

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0393 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,020 $2,216 Implemented
NC0393 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $100 Implemented
NC0393 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $2,795 Implemented
MI0179 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $23,952 $3,320 Implemented
MI0179 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,351 $1,210 Implemented
MI0179 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,117 $40 Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
LL0311 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $680 Implemented
LL0311 # 03 Y:2009 03 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,635 $600 Implemented
LL0311 # 06 Y:2009 06 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $94 $210 Implemented
UW0025 # 03 Y:2009 03 2009 USE OPTIMUM TEMPERATURE $13,200 $19,800 Implemented
UW0025 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $2,986 $6,091 Implemented
OK0769 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $1,922 Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
MI0173 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,609 $1,563 Implemented
MI0173 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,203 $950 Implemented
MI0173 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,034 $7,000 Implemented
MI0173 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,963 $1,210 Implemented
MI0173 # 07 Y:2008 07 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,484 $4,400 Implemented
SF0367 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,802 $10,433 Implemented
SF0367 # 11 Y:2008 11 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,022 $18,000 Implemented
SF0367 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,318 $11,290 Implemented