Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,185
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0407 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,084 | $12,025 | Implemented |
IA0407 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,098 | $4,794 | Implemented |
UD0762 # 01 Y:2007 | 01 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,211 | $0 | Implemented |
UD0762 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,650 | $33,580 | Implemented |
UD0762 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,709 | $1,465 | Implemented |
MA0618 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,879 | $79,554 | Implemented |
MA0618 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,820 | $26,621 | Implemented |
MA0618 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,316 | $3,220 | Implemented |
MA0618 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,204 | $29,875 | Implemented |
MA0618 # 05 Y:2007 | 05 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,589 | $17,740 | Implemented |
MA0618 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $7,795 | $1,924 | Implemented |
MA0618 # 07 Y:2007 | 07 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,906 | $18,500 | Implemented |
MA0618 # 08 Y:2007 | 08 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,125 | $3,552 | Implemented |
MA0618 # 09 Y:2007 | 09 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $1,070 | $340 | Implemented |
IA0406 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,718 | $500 | Implemented |
IA0406 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $896 | $100 | Implemented |
IA0406 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $364 | $25 | Implemented |
IA0406 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $507 | $100 | Implemented |
IA0406 # 07 Y:2007 | 07 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $21,600 | $10,000 | Implemented |
LL0272 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $58,782 | $19,636 | Implemented |
SU0254 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,902 | $0 | Implemented |
SU0254 # 02 Y:2007 | 02 | 2007 | USE SYNTHETIC LUBRICANT | $3,743 | $0 | Implemented |
SU0254 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,618 | $0 | Implemented |
SU0254 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,048 | $381 | Implemented |
SU0254 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $440 | $69 | Implemented |