Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1049 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,601 | $1,060 | Implemented |
OK1049 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,589 | $0 | Implemented |
OK1049 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $820 | Implemented |
OK1042 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,703 | $0 | Implemented |
OK0981 # 01 Y:2018 | 01 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $124,716 | $75,000 | Implemented |
OK0898 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $6,545 | $27,400 | Implemented |
OK0898 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $463 | Implemented |
OK0898 # 04 Y:2014 | 04 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $303 | $270 | Implemented |
OK0898 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,132 | $1,689 | Implemented |
OK0839 # 11 Y:2013 | 11 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $32,511 | $25,606 | Implemented |
OK0839 # 13 Y:2013 | 13 | 2013 | OPTIMIZE PLANT POWER FACTOR | $12,090 | $11,638 | Implemented |
OK0839 # 09 Y:2013 | 09 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $873 | $490 | Implemented |
OK0839 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,708 | $5,684 | Implemented |
OK0839 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,494 | $33,218 | Implemented |
OK0839 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,395 | $1,750 | Implemented |
OK0839 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,540 | $0 | Implemented |
OK0839 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,514 | $27,500 | Implemented |
OK0769 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,911 | $4,475 | Implemented |
OK0769 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $788 | $1,922 | Implemented |
OK0717 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,551 | $53,370 | Implemented |
OK0717 # 05 Y:2005 | 05 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,002 | $9,712 | Implemented |
OK0717 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $1,466 | $1,039 | Implemented |