IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0133 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,825 $0 Not Implemented
UU0133 # 03 Y:2018 03 2018 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $30,169 $97,680 Not Implemented
UU0133 # 02 Y:2018 02 2018 USE POWER DURING OFF-PEAK PERIODS $206,416 $1,600 Not Implemented
UU0133 # 01 Y:2018 01 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $473,255 $175,000 Not Implemented
BS0086 # 02 Y:2016 02 2016 REPLACE BOILER $4,643 $61,724 Not Implemented
BS0086 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $12,315 $14,270 Not Implemented
BS0086 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $280 Implemented
BS0086 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,877 $1,280 Implemented
BS0086 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,268 $147 Not Implemented
UU0078 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,970 $400 Implemented
UU0078 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,890 $4,820 Implemented
UU0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,465 $405 Implemented
UU0078 # 01 Y:2004 01 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,850 $10,000 Not Implemented
UU0078 # 05 Y:2004 05 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,620 $12,000 Not Implemented
UU0078 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,720 $1,120 Not Implemented
UU0078 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $10,400 $11,590 Not Implemented
UU0078 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $810 $450 Implemented
UU0045 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,079 $320 n/a
UU0045 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,090 $886 n/a
UU0045 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,500 $550 n/a
UU0045 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,967 $0 n/a
UU0045 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $0 n/a