IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,688

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0847 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,596 $8,400 Not Implemented
GT0847 # 06 Y:2008 06 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $22,551 $68,143 Not Implemented
UD0777 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $621,360 $28,800 Not Implemented
UD0777 # 02 Y:2008 02 2008 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $468,137 $140,000 Not Implemented
UD0777 # 03 Y:2008 03 2008 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $86,400 $85,000 Not Implemented
UD0777 # 04 Y:2008 04 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $70,469 $40,000 Implemented
UD0777 # 05 Y:2008 05 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $45,421 $74,873 Not Implemented
UD0777 # 06 Y:2008 06 2008 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $35,664 $50,000 Implemented
UD0777 # 07 Y:2008 07 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $35,347 $15,000 Implemented
UD0777 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,252 $1,000 Implemented
UD0777 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,821 $1,900 Not Implemented
UD0777 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,188 $28,755 Not Implemented
UD0777 # 11 Y:2008 11 2008 USE MINIMUM STEAM OPERATING PRESSURE $7,900 $0 Not Implemented
UD0777 # 12 Y:2008 12 2008 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $8,318 $19,000 Implemented
UD0777 # 13 Y:2008 13 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,240 $0 Implemented
UD0777 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $3,815 Implemented
UD0777 # 15 Y:2008 15 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,436 $0 Not Implemented
UA0014 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $0 Implemented
UA0014 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,143 $1,040 Implemented
UA0014 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented
UA0014 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $5,800 $14,850 Not Implemented
UA0014 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,454 $591 Implemented
UA0014 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,520 Not Implemented
UA0014 # 07 Y:2008 07 2008 SHUT OFF PILOTS IN STANDBY EQUIPMENT $457 $72 Implemented
UA0014 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $1,164 Not Implemented