Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,688
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0306 # 11 Y:2004 | 11 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $777 | $1,060 | Not Implemented |
WV0306 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $696 | $3,480 | Implemented |
WV0306 # 13 Y:2004 | 13 | 2004 | INSTALL OCCUPANCY SENSORS | $395 | $800 | Implemented |
WV0306 # 14 Y:2004 | 14 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $318 | $105 | Not Implemented |
BD0269 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,588 | $225 | Implemented |
BD0269 # 02 Y:2004 | 02 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,568 | $3,200 | Implemented |
BD0269 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,822 | $1,400 | Implemented |
BD0269 # 04 Y:2004 | 04 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,160 | $5,500 | Implemented |
BD0269 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $42 | Not Implemented |
BD0269 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,736 | $0 | Implemented |
BD0269 # 07 Y:2004 | 07 | 2004 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,363 | $340 | Implemented |
BD0269 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,601 | $731 | Implemented |
BD0269 # 09 Y:2004 | 09 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,243 | $2,000 | Implemented |
BD0269 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $1,157 | $1,200 | Not Implemented |
BD0269 # 11 Y:2004 | 11 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $500 | Implemented |
BD0269 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $373 | $368 | Implemented |
BD0269 # 13 Y:2004 | 13 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $274 | $850 | Not Implemented |
BD0269 # 14 Y:2004 | 14 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $236 | $70 | Implemented |
BD0269 # 15 Y:2004 | 15 | 2004 | METER WASTE WATER | $587 | $165 | Implemented |
BD0269 # 16 Y:2004 | 16 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $423 | $746 | Implemented |
TA0080 # 01 Y:2004 | 01 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $67,776 | $13,000 | Implemented |
TA0080 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,160 | $585 | Implemented |
TA0080 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,900 | $875 | Implemented |
TA0080 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,990 | $1,600 | Implemented |
TA0080 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,000 | $1,000 | Implemented |